Our response to: Review of Gas Transporter traditional metering licence conditions

We supported the extension of existing obligations as an interim measure but suggested that the additional 12 months would be insufficient given the current pace of smart meter installations and should instead be tied to a metric based on the number of installed smart meters/demand for legacy metering.

Read our response in full here.

Latest Consultations

Closeup shot hands using laptop computer and internet, typing on
Consultation opens on key Performance Assurance documents for 2026-27
Your Responses To: Consumer Consent Solution Design Consultation
CCS Design Consultation Image 1100px
CLOSED: Consumer Consent Solution Design Consultation
market stock graph and information with city light and electrici
CLOSED: Our API Gateway consultation is now open!

Latest Responses

Our response to: Consultation on securing open data in energy
Our response to: Consultation on the draft second preliminary Strategic Direction Statement
Closeup shot hands using laptop computer and internet, typing on
Our response to: Ofgem's Market Stabilisation Charge licence condition consultation
Our response to 'Proposed indicators of Ofgem performance and the health of the energy sector'

Share this post